Skip to main content
Banker among city lights at night, illustrating an IRRBB glossary of interest rate risk acronyms from ALCO to ΔEVE
Mirai RiskTech By Mirai RiskTech
Nov 11, 2026, 9:00:19 AM
6'

IRRBB Glossary: 40+ Acronyms Decoded, from ALCO to ΔEVE

#Interest Rate Risk #Regulation

Interest rate risk in the banking book comes wrapped in four jurisdictions' worth of acronyms, and half the difficulty of reading a regulation, a disclosure or an ICAAP is simply decoding them. This IRRBB glossary defines the 40+ terms you will actually meet, from ALCO to ΔEVE, alphabetically, in one table. Where a term has its own article, the entry links to it.

The IRRBB glossary, A to Z

TermMeaning
ALCOAsset and Liability Committee, the senior committee that owns balance-sheet risk decisions
ALMAsset and Liability Management, the function managing structural balance-sheet risks
AOCIAccumulated Other Comprehensive Income, the equity account holding unrealized gains and losses on FVOCI/AFS securities; whether it counts in CET1 is the key US capital question. See AOCI opt-out explained.
AFS / HTMAvailable for Sale / Held to Maturity, the US securities classifications; AFS marks to fair value through AOCI, HTM stays at amortized cost
Automatic optionalityEmbedded options exercised mechanically when in the money, such as caps, floors and calls
Basis riskThe risk from instruments repricing at the same time off reference rates that do not move in lockstep
BCBS 368 / d368The Basel Committee's April 2016 IRRBB standard
Behavioral optionalityCustomer options exercised imperfectly, such as prepayment, NMD withdrawal and early redemption
CAMELSThe US supervisory rating system; its "S" (Sensitivity to market risk) component carries interest rate risk
CCAR / DFASTThe US capital planning and stress testing regimes
CET1 / Tier 1Common Equity Tier 1 and Tier 1 capital; the outlier tests use Tier 1 as their denominator
Constant balance sheetThe NII convention under which maturing positions are replaced like for like
Core depositsThe stable, rate-insensitive fraction of NMDs treated as long-term funding
CPRConditional Prepayment Rate, the annualized speed at which borrowers prepay fixed-rate loans
CSRBBCredit Spread Risk in the Banking Book, the risk from market-wide credit and liquidity spread moves, distinct from both IRRBB and credit risk
C-SREP / PSMCapital SREP / Periodic Summary Meeting, the PRA's supervisory assessment cycle and the point at which its outcome is communicated
d578The July 2024 Basel recalibration of the IRRBB shock scenarios, in force 1 January 2026. See the IRRBB outlook for 2026-2028.
Deposit beta / pass-throughThe fraction of a market rate move that a bank passes on to its deposit rates. See what the data says on deposit assumptions.
Duration of equityA summary of the net duration mismatch; when positive, equity value falls as rates rise
EaREarnings at Risk, a scenario or distributional generalization of ΔNII
EVE / ΔEVEEconomic Value of Equity, the present value of banking book cash flows on a run-off basis; ΔEVE, its change under rate scenarios, is the core value metric. See EVE vs NII explained.
FSA017The UK interest rate gap report (repricing gap by bucket and currency), feeding the PRA's Pillar 2A assessment
FTPFunds Transfer Pricing, the internal mechanism that concentrates rate risk in Treasury. See margin management and FTP.
Gap riskThe risk from repricing-timing mismatches, with a parallel and a yield-curve component
GL / RTS / ITSThe EBA's instruments: Guidelines, plus Regulatory and Implementing Technical Standards, which become Level 2 law
HQLAHigh-Quality Liquid Assets under the LCR; their interaction with IRRBB is a post-2023 workstream
ICAA PartThe Internal Capital Adequacy Assessment Part of the PRA Rulebook; its Chapter 9 holds the UK's binding IRRBB rules
ICAAPInternal Capital Adequacy Assessment Process, where banks self-assess the capital held against IRRBB
IRRBBInterest Rate Risk in the Banking Book. See SVB's IRRBB anatomy.
J-templatesThe EU's dedicated supervisory reporting templates for IRRBB (J 01.00 to J 08.00). See EBA CP/2026/07 and IRRBB reporting.

How to Build an IRRBB Framework That Holds Up Under Scrutiny

EVE and NII, the six shock scenarios, CSRBB and supervisory outlier tests across Basel, the EU, the UK and the US: a complete reference for treasury, ALM and risk teams.
Get Your Guide
IRRBB regulation guide by Mirai RiskTech: Basel, EU, UK and US
TermMeaning
KAOThe automatic option risk add-on in the standardized framework
LFIThe Federal Reserve's Large Financial Institution rating system for banks above $100bn
NEVNet Economic Value, the NCUA's standardized supervisory test for US credit unions
NII / ΔNIINet Interest Income; ΔNII, its change under rate scenarios, is the core earnings metric. See how to project NII under IRRBB.
NMDNon-Maturity Deposit, a deposit with no contractual maturity and the central behavioral modeling problem in IRRBB. See Non-Maturity Deposits Explained.
Outlier test / SOTSupervisory (Outlier) Test, the threshold tests flagging excessive IRRBB: EVE above 15% of Tier 1 (Basel and EU), NII above 5% of Tier 1 (EU). See the EVE supervisory outlier test.
P2R / P2GPillar 2 Requirement (binding) and Pillar 2 Guidance (expected), the EU's SREP capital outcomes
Pillar 2A / PRA bufferThe UK's firm-specific capital requirement, with IRRBB a named component set per SoP5/15; the PRA buffer sits above it, set from stress-test results
Pipeline riskOptionality written before positions reach the balance sheet, such as rate locks and loan commitments
Run-off balance sheetThe EVE convention under which positions amortize and are not replaced
SDDTSmall Domestic Deposit Taker, the UK's Strong and Simple category; the capital process is simplified but the IRRBB substance is unchanged
SNCISmall and Non-Complex Institution, the EU category qualifying for simplified approaches and reporting
SREPSupervisory Review and Evaluation Process, the EU's Pillar 2 assessment
SRP31 / SRP98 / DIS70The Basel Framework chapters holding the IRRBB standard, its application guidance and the disclosure requirements
SS / SoPPRA Supervisory Statement / Statement of Policy; SS31/15 (ICAAP and SREP expectations) and SoP5/15 (Pillar 2 methodologies) carry the UK's IRRBB detail
SSMSingle Supervisory Mechanism, the ECB together with the national competent authorities
Tailoring categoriesThe US Category I-IV framework calibrating prudential requirements by size and complexity

One risk, several vocabularies

A closing warning for cross-border readers: the same concepts travel under different names. The Basel and EU world says IRRBB; US guidance says simply IRR, interest rate risk, because the 1996-vintage framework predates the banking book label.

The mechanism that flags excessive risk answers to three names depending on where you sit:

  • the EU's supervisory outlier test (SOT), a fully prescribed calculation with EVE and NII thresholds in law;
  • the Basel and UK outlier test, the 15% of Tier 1 trigger for supervisory attention;
  • the UK's Pillar 2A add-on, which goes one step further and converts the assessment into a routine, firm-specific capital charge.

Same risk, three regulatory dialects. This glossary should let you read all of them.

For the complete picture, from EVE and NII sensitivities and the six supervisory shock scenarios to outlier tests and how Basel, the EU, the UK and the US differ, see Mirai RiskTech's guide IRRBB regulation across Basel, the EU, the UK and the US: a complete reference.